Integration of the Dunkirk co2 terminal on the liquefied natural gas (lng) terminal site

RÉSUMÉ

The ZIBAC DKarbonation project study evaluated the integration of the Dunkirk CO₂ terminal on the LNG terminal site to benefit from industrial, particularly energy, synergies. Techno-economic analyses showed potential operational cost savings, offset by an investment premium. Considering all the criteria studied, the LNG terminal site was selected, while the integration of cold energy was not implemented at this stage but remains possible for future developments.